03-05-2019, 08:21 PM
Well the welding was easy compared to the demolition to make space for the shower base. Damn ambulances are built like tanks! Two hours to only get half way done. So here is where I am at now.
Here is a rough idea of what it will look like, only floor level.
Next adventure will be cutting the corrugated floor that is an astounding 1/8” thick!!! Gonna need some more saw blades.
Sent from my iPhone using Tapatalk Pro
Here is a rough idea of what it will look like, only floor level.
Next adventure will be cutting the corrugated floor that is an astounding 1/8” thick!!! Gonna need some more saw blades.
Sent from my iPhone using Tapatalk Pro